Sinoway provided support for Henan suffering from a serious disaster

Sinoway provided support for Henan suffering from a serious disaster

2021-08-18
On August 18, 2021, Weifang Henan Chamber of Commerce gave a banner of “Sinoway provided support for Henan suffering from a serious disaster” to Sinoway for appreciating its loving donation during the flood disaster in Henan.
Planting trees and greening activities for factory in spring

Planting trees and greening activities for factory in spring

2021-05-19
Since March this year, the two factories of Sinoway started planting trees and greening activities in spring, and all employees of the company participated in. In Shandong and Jiangsu factories, they planted more than 10,000 trees of more than 10 kinds, such as tassel, ginkgo biloba, fraxinus chinensis, platanus orientalis, purple-leaf plum, photinia fraseri, sophora japonica, willow and elm, as well as more than 20,000 of more than 20 varieties of flowers and shrubs by means of full coverage outside the factory wall, within the office area, production area, project reserved area, etc. through centralized procurement by the company, donation by suppliers and employees. Grass seeds and flower seeds were all planted on the bare surface. At the same time, saplings suitable for saline-alkali land were selected for the Phase I and Phase II projects, looking forward to taking root and sprouting in the coming year.
Disclosure of environmental protection information in 2020

Disclosure of environmental protection information in 2020

2020-12-31
Disclosure of environmental protection information I. Basic information
Publicity on environmental protection acceptance of Phase I project completion of Sinoway Carbon (Jiangsu) Co., Ltd.

Publicity on environmental protection acceptance of Phase I project completion of Sinoway Carbon (Jiangsu) Co., Ltd.

2020-09-08
I. Program overview Project investment: CNY 400 million Project name: Project with an annual output of 280,000 tons of carbon products and comprehensive utilization of waste heat Construction address: Daxingzhuang Village, Haitou Town, Ganyu District Construction unit: Sinoway Carbon (Jiangsu) Co., Ltd. Contact: Manager Li (Tel.: 0518-86861767)
Bidding/tendering for annual overhaul of desulfurization system in Weifang factory was successfully completed

Bidding/tendering for annual overhaul of desulfurization system in Weifang factory was successfully completed

2020-05-20
In order to ensure the smooth operation of desulfurization system, Weifang Factory recently conducted a unified bidding for the annual overhaul of desulfurization system. The Comprehensive Purchasing Department of Weifang Company is responsible for the bidding for the annual overhaul of desulfurization system. The department has prepared detailed bidding documents according to the annual overhaul plan of Weifang Factory, and invited two companies, COHEN and MSCI, to participate in the tendering.
Sinoway opens quarterly logistics total amount bidding/tendering and bargaining mode

Sinoway opens quarterly logistics total amount bidding/tendering and bargaining mode

2020-05-07
On May 4th, Sinoway Energy Business Department conducted market bidding/tendering and bargaining for logistics and transportation of Jiangsu branch and Weifang branch from May to July respectively.
Sinoway donated the fourth batch of pandemic prevention materials

Sinoway donated the fourth batch of pandemic prevention materials

2020-02-19
On February 19, 2020, the pandemic prevention materials including10 tons of medical alcohol donated by Sinoway Carbon (Jiangsu) Co., Ltd. to Shaanxi University of Technology were successfully delivered.
Sinoway donated the third batch of pandemic prevention materials to Wuhan

Sinoway donated the third batch of pandemic prevention materials to Wuhan

2020-02-16
On February 16, 2020, the third batch of materials including 1,500 boxes of mineral water donated by Sinoway Carbon (Shandong) Co., Ltd. to Wuhan were successfully delivered to the Control and Prevention Command Office for COVID-19 in Dongxihu District of Wuhan for use in major hospitals, communities, isolation zones and duty zones.
Sinoway donated the second batch of pandemic prevention materials to Wuhan

Sinoway donated the second batch of pandemic prevention materials to Wuhan

2020-02-15
On February 15, 2020, the second batch of materials including 11 tons of sterilized alcohol donated by Sinoway Carbon (Jiangsu) Co., Ltd. to Wuhan were successfully delivered to Wuhan Jiang'an Charity Federation and distributed to various community centers.
Sinoway donated the first batch of pandemic prevention materials to Wuhan

Sinoway donated the first batch of pandemic prevention materials to Wuhan

2020-02-11
On February 11, 2020, the goggles donated by Sinoway Carbon (Shandong) Co., Ltd. were successfully sent to Tongji Medical College in Wuhan.
Disclosure of environmental protection information in 2019

Disclosure of environmental protection information in 2019

2019-12-31
Disclosure of environmental protection information
Soil and water conservation facilities in 560kt/a petroleum coke calcination project passed the acceptance

Soil and water conservation facilities in 560kt/a petroleum coke calcination project passed the acceptance

2019-12-20
On December 11, 2019, Sinoway Carbon (Shandong) Co., Ltd. hosted the acceptance meeting of soil and water conservation facilities in 560kt/a petroleum coke calcination project in Weifang Binhai Economic and Technological Development Zone. The participants include invited experts of soil and water conservation, representatives of Shandong Tiancheng Engineering Consulting Co., Ltd. (scheme preparation unit), Shandong Chunxu Chemical Design Co., Ltd. (design unit), Weifang Ruisheng Construction and Installation Engineering Co., Ltd. (construction unit), Zoucheng Huayuan Engineering Construction Supervision Co., Ltd. (supervision unit), Shandong Tiancheng Engineering Consulting Co., Ltd. (monitoring unit), Weifang Jiuli Environmental Engineering Co., Ltd. (facility acceptance report preparation unit), etc. Some representatives of the acceptance team inspected the project site, consulted the technical data, and listened to the reports of the water and soil conservation scheme preparation unit, design unit, monitoring unit, construction unit, supervision unit and facility acceptance report preparation unit. After careful discussion, the acceptance opinions of soil and water conservation facilities in 560kt/a petroleum coke calcination project were formed. They agreed that the water and soil conservation facilities of the project have passed the acceptance.