Disclosure of environmental protection information in 2023

Date: 07 Mar,2024 Views: 4009

Disclosure of environmental protection information in 2023


1. basic information

name of organization

Sinoway Carbon Co., LTD

legal representative

Han Erdong

institutional framework

code

913707005845191988

Industry type

Calcination of petroleum coke

Number of employees

200

contacts

Zhang Lianzhu

contact number

15165637803

portraiture

0536-5318266

electronic mailbox

zhanglianzhuweifangduans@sinowaycarbon.com

Unit address

No.006067, Huanghe West Street, Lingang Industrial Park, Binhai Economic and Technological Development Zone, Weifang City

 Main contents, products and scale of production, operation and management services


The company is mainly engaged in calcined petroleum coke, with a designed production scale of 560,000 tons / year.

Environmental impact assessment and other environmental protection administrative licensing information of the project

 In 2011, the company entrusted Qingzhou Fangyuan Environmental Impact Assessment Service Co., Ltd. to carry out the eia work of this project and prepared the eia report, which was approved by Weifang Environmental Protection Bureau on December 31,2011. The approval number is [2011] No.303. Main project completed in October 2013, and on May 5,2014, Weifang environmental protection bureau binhai economic development zone branch of trial production of approval, approval document number for Weifang diesel bin ring try word [2014] 7, the project into the trial production stage, in January 2015 to Weifang binhai economic development zone bureau submitted the acceptance application report, and on June 13,2015 to environmental acceptance approval, approval document number for Weifang diesel bin ring test [2015] no. 6, into the formal production stage. On August 15,2018, the second phase of the project was independently accepted. During the production period, the company has applied for the discharge permit (913707005845191988001V) to ensure that the enterprise is sewage.

3. Emergency response plan for environmental emergencies

According to the Interim Measures for the Management of Emergency Plan for Environmental Emergencies and the Measures for the Administration of the Ministry of Environmental Protection, the company shall compile emergency plans for environmental emergencies and report them to the environmental protection department for the record.

4. The construction and operation of pollution control facilities

(1) Waste water and pollution control facilities

The wastewater production capacity of this project is about 4.5m3 / d, which is mainly domestic wastewater. The waste water is treated by the company's sewage treatment pool and used for greening after reaching the standard.

(2) Waste gas and pollution control facilities

The waste gas produced in the production process of this project mainly includes organized waste gas and unorganized waste gas. Organized waste gas mainly includes calcination waste gas of petroleum coke calcination section, dust waste gas of calcination furnace, dust waste gas of raw material, product packaging, storage section, and ammonium sulfur drying waste gas. The organized waste gas is denitration by SNCR, efficient cloth bag and dust collector, and is discharged to the standard after desulfurization treatment by ammonia desulfurization tower. It is currently running normally. Unorganized waste gas mainly refers to the unorganized waste gas in the calcination workshop, natural volatilization of stored materials, dust generated by vehicle loading and unloading and transportation, slight leakage of workshop equipment and pipelines, etc. The dust in the calcination workshop shall be removed by the bag dust collector. The rest of the installed dustproof shed and no power fans should be designed, manufactured or selected according to the national standards, and used after inspection, in the process of use, found corrosion is serious, not standard, timely replacement, and quickly replaced according to the correct operation mode, to ensure normal use, to avoid the occurrence of pollution.

5. Discharge information

It includes the name of major pollutants and characteristic pollutants, discharge mode, quantity and distribution of discharge outlets, discharge concentration and total amount, exceeding the standard, as well as the implemented pollutant discharge standards and the approved total amount.

List of exhaust gas and discharge information

order number

Emission port number

Emission port name

Pollutant species

Approved concentration limit (mg / Nm 3)

Emission mode

Overstandard situation

Number of discharge outlets

Emission direction

1

DA001

First-phase product storage and packaging process exhaust cylinder

particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment

2

DA002

Discharge port of first-stage calcination feeding process

particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment

3

DA003

Phase I product storage and packaging process exhaust cylinder 1

particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment

4

DA004

Waste heat boiler exhaust cylinder

ammonia nitrogen oxide

100

continuous blow-down

not have

1

Direct discharge outside the environment

ammonia

3

sulfur dioxide

50

particulate matter

10

5

DA005

Raw material system exhaust gas exhaust bucket

particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment

6

DA006

Second-stage calcination feeding process exhaust cylinder 2

particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment

7

DA007

Phase II product storage and packaging process exhaust cylinder 1

particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment

8

DA008

Phase II product storage and packaging process exhaust cylinder 2

particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment

9

DA009

Second-phase calcination feeding process discharge 1

particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment

10

DA010

2 # desulfurization tower exhaust cylinder

ammonia nitrogen oxide

100

continuous blow-down

not have

1

Direct discharge outside the environment

ammonia

3

sulfur dioxide

50

particulate matter

10

11

DA011

Ammonium sulfate drying exhaust exhaust cylinder

Ammonia (ammonia)

/

Intermittent emissions

not have

1

Direct discharge outside the environment

particulate matter

10

12

DA012

Phase II transmission process gas exhaust cylinder

particulate matter

10

Intermittent emissions

not have

1

Direct discharge outside the environment




Total atmospheric emission permits of enterprises

order number

Pollutant species

First year (t / year)

Year 2 (t / year)

Third year (t / year)

1

particulate matter

30.24

30.24

30.24

2

sulfur dioxide

139.6

139.6

139.6

3

nitrogen oxide

302.4

302.4

302.4

4

VOCS

/

/

/


Domestic wastewater treatment: the company has a new biological integrated treatment equipment, treated all the domestic wastewater, and used as green water after qualified treatment. The total discharge is calculated according to the discharge of 1800m3 water per year.

order number

Solid waste name

Solid waste category

Solid waste production capacity (ton)

Disposal quantity (ton)

process mode

remarks

1

Waste packaging, and other materials

General solid waste

551.59

551.59

Entrusted disposal

temporary storage

List of solid waste production information


6. Disclosure of hazardous waste information

Company name: China Carbon Energy (Shandong) Co., LTD

Address: No.06067, Huanghe West Street, Lingang Industrial Park, Binhai Economic and Technological Development Zone, Weifang City

Legal representative and telephone number: Han Erdong 18364651970

Person in charge of environmental protection and telephone number: Zhang Lianzhu 15165637803

Scale of hazardous waste generation:

Number of hazardous waste storage facilities: 1 warehouse

Building area of hazardous waste storage facilities: warehouse 42 square meters

Disclosure of information on the prevention and control of hazardous waste pollution

order number

Hazardous waste name

Hazardous waste code

EIA approval

Generate the source

Pollution prevention and control measures

person liable

1

Waste mineral oil

HW08

Hazardous waste record

current production

Entrusted processing






Zhang Lianzhu

2

Waste paint bucket

HW49

Hazardous waste record

current production

Entrusted processing

3

Laboratory waste liquid

HW49

Hazardous waste record

current production

Entrusted processing

4

Waste mineral oil barrel

HW08

Hazardous waste record

current production

Entrusted processing

5

Waste mineral oil

HW08

Hazardous waste record

current production

Entrusted processing

6

Waste activated carbon

HW49

Hazardous waste record

current production

Entrusted processing



List of hazardous waste generation information

order number

Name of the hazardous waste

Hazardous waste category

Hazardous waste production capacity (ton)

Previous storage capacity (ton)

Disposal quantity (ton)

process mode

remarks

1

Waste mineral oil barrel

HW08

0.296

0.044

0.34

Entrusted disposal

Temporary storage of hazardous waste storage

2

Waste paint bucket

HW49

0.6121

00.024

0.6402

Entrusted disposal

Temporary storage of hazardous waste storage

3

Laboratory waste liquid

HW49

0.0403

0

0.0213

Entrusted disposal

Temporary storage of hazardous waste storage

4

Waste mineral oil

HW08

0.387

0.053

0.44

Entrusted disposal

Temporary storage of hazardous waste storage

5

Waste activated carbon

HW49

0.048

0

0.048

Entrusted disposal

Temporary storage of hazardous waste storage

6

Waste oil bucket

HW49

0.3867

0

0.1307

Entrusted disposal

Temporary storage of hazardous waste storage

7

mud

HW49

4.6367

0

4.6367

Entrusted disposal

Temporary storage of hazardous waste storage

8

Waste lubricating oil

HW08

2.6121

0

2.4831

Entrusted disposal

Temporary storage of hazardous waste storage




1. basic information

name of organization

Sinoway Carbon (Jiangsu) Co., LTD

legal representative

Meng Xun

institutional framework
code

91320707MA1T6KYT65

Industry type

C3091 Graphite and carbon products manufacturing

Number of employees

141

contacts

Li Xin

contact number

19952507066

portraiture

/

electronic mailbox

lixin @sinowaycarbon.com

Unit address

West of Lanhai Road (No.5), Haizhou Bay Biotechnology Park, Ganyu District, Lianyungang City, Jiangsu Province

 Main contents, products and scale of production, operation and management services

Development, production and sales of carbon products; production and sales of steam products; electricity sales service, design production scale of 840,000 tons / year, 280,000 tons / year.


Environmental impact assessment and other environmental protection administrative licensing information of the project

 In 2018, China Carbon Energy (Jiangsu) Co., Ltd. entrusted Jiangsu Zhisheng Environmental Technology Co., Ltd. to carry out the eia work of this project and prepared the eia report form, which was approved by the Environmental Protection Bureau of Ganyu District on April 3,2018 (Ganhuan Table Fu [2018] No.44). The construction scale of the project is an annual output of 840,000 tons of calcined coke, providing waste heat 864000t / a, which is divided into two phases. The first phase is 280,000 t / a, the waste heat 288000t / a; the second phase is 560,000 t / a, and the waste heat 576000t / a. The production line of 280,000 tons of carbon products and waste heat comprehensive utilization for the first phase of the project has been completed and commissioned on September 6,2019, and the independent acceptance opinion of completed environmental protection was obtained on September 2,2020. On January 21,2020, the pollutant discharge permit (permit number: 91320707MA1T6KYT65001V) was obtained, and the second phase of the project is not under construction yet.

3. Emergency response plan for environmental emergencies
According to the Interim Measures for the Management of Emergency Plan for Environmental Emergencies and the Measures for the Administration of the Ministry of Environmental Protection, the company shall compile emergency plans for environmental emergencies and report them to the environmental protection department for the record.
4. The construction and operation of pollution control facilities
(1) Waste water and pollution control facilities
In this project, no production wastewater production, wastewater is mainly domestic wastewater and initial rainwater. The treatment scale of integrated domestic sewage facilities is 15m3/ D. The domestic sewage is treated by the integrated equipment of the domestic sewage in the plant for the centralized treatment of the sewage treatment plant in the industrial park. The wastewater quantity of phase I project is 3072m3(10.24 m3/ D), the treatment scale of the existing domestic sewage integrated facilities is 15m3/ d can meet the requirements of wastewater treatment of the phase I project.

(2) Waste gas and pollution control facilities
The waste gas produced in the production process of this project mainly includes calcined waste gas and workshop dust waste gas. The calcined flue gas is treated by "SNCR denitration + waste heat boiler + carbon powder adsorption dust removal + cloth bag dust removal + secondary ammonia desulfurization + fog remover purification", and is discharged at high altitude by 79.9m high exhaust cylinder. The dust removal rate of this set is not less than 99%. It is currently running normally. Dust waste gas mainly refers to the dust generated by the unloading, transportation and screening of raw materials in the calcination workshop, calcination furnace, coke discharge and conveying after calcination, and crushing, storage and packaging of finished products. Calcined dust waste gas is treated by "SNCR denitration + waste heat boiler + carbon powder adsorption dust removal + bag dust removal + secondary ammonia desulfurization + fog remover purification", and is discharged by 79.9m high exhaust cylinder. Dust waste gas from other processes is collected through the negative pressure of the upper gas collecting hood, led by the induced draft fan to the bag dust collector system for treatment, and then discharged at high altitude through the exhaust cylinder.
5. Discharge information
It includes the name of major pollutants and characteristic pollutants, discharge mode, quantity and distribution of discharge outlets, discharge concentration and total amount, exceeding the standard, as well as the implemented pollutant discharge standards and the approved total amount.

List of exhaust gas and discharge information

order number

Emission port number

Emission port name

Pollutant species

Approved concentration limit (mg / Nm 3)

Emission mode

Overstandard situation

Number of discharge outlets

Emission direction

1

DA007

Raw material discharge waste gas exhaust cylinder

particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment

2

DA008

Raw material delivery, crushing, and screening

exhaust funnel

particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment

3

DA009

Finished packaging exhaust

a section of thick bamboo


particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment

4

DA010

Finished product exhaust

a section of thick bamboo


particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment

5

DA011

Finished delivery exhaust

a section of thick bamboo


particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment

4

DA012

Calcination of waste gas exhaust cylinder

ammonia nitrogen oxide

100

continuous blow-down

not have

1

Direct discharge outside the environment

ammonia

/

sulfur dioxide

100

particulate matter

10

5

DA013

Return the ingredients to unload the car row

inflator

particulate matter

10

continuous blow-down

not have

1

Direct discharge outside the environment


List of waste water discharge information

order number

Emission port number

Emission port name

Pollutant species

Approved concentration limit (mg / Nm 3)

Emission mode

Overstandard situation

Number of discharge outlets

Emission direction

1

DW002

Total discharge outlet of the plant

ammonia nitrogen

25

Intermittent discharge, discharge flow is unstable and irregular

not have

1

Lianyungang City Chengfa Sewage Treatment Co., LTD

PH price

6-9

total nitrogen

30

five-day BOD

300

chemical oxygen demand

200

total phosphorus

2

suspended matter

70

Total salt amount

/


Total atmospheric emission permits of enterprises

order number

Pollutant species

First year (t / year)

Year 2 (t / year)

Third year (t / year)

Fourth year (t / year)

Year 5 (t / year)

1

particulate matter

9.47

30.24

30.24

30.24

30.24

2

sulfur dioxide

151.2

139.6

139.6

139.6

139.6

3

nitrogen oxide

151.2

302.4

302.4

302.4

302.4


Domestic wastewater treatment: the treatment scale of domestic sewage integrated facilities is 15m3/ d, The domestic sewage shall be treated by the domestic sewage integrated equipment in the plant and sent to the park sewage treatment plant for centralized treatment. The wastewater quantity of phase I project is 3072m3(10.24 m3/ D), the treatment scale of the existing domestic sewage integrated facilities is 15m3/ d can meet the requirements of wastewater treatment of the phase I project.


Solid waste foundation information sheet

order number

Solid waste category

Solid waste name

code

Hazardous characteristics

class

physical behavior

Generate the link

the direction in which sb. or sth. has gone

remarks


1

General industrial solid waste

Other general industrial solid wastes


SW59


/

Class I industrial solid waste

Solid state (solid state waste, S)

Graphite, carbon products SCX001

Store it by yourself and use it by yourself

After calcined coke crushing dust collector dust


2

General industrial solid waste

Other general industrial solid wastes


SW59


/

Class I industrial solid waste

Solid state (solid state waste, S)

Graphite, carbon products SCX001

Store it by yourself and use it by yourself

After calcined coke storage and transportation of dust collector dust


3

General industrial solid waste

Other general industrial solid wastes


SW59


/

Class I industrial solid waste

Solid state (solid state waste, S)

Graphite, carbon products SCX001

Store it by yourself and use it by yourself

Dust from the crushing room


4

General industrial solid waste

Other general industrial solid wastes


SW59


/

Class I industrial solid waste

Solid state (solid state waste, S)

Graphite, carbon products SCX001

Self-storage, commissioned use

ammonia sulfate


5

General industrial solid waste

flyash


SW02


/

Class I industrial solid waste

Solid state (solid state waste, S)

Graphite, carbon products SCX001

Self-storage, commissioned use

Fly ash used to absorb the moisture of the calcined flue gas


6

General industrial solid waste

bira nest


SW03


/

Class I industrial solid waste

Solid state (solid state waste, S)

Graphite, carbon products SCX001

Self-storage, commissioned use

Calcination produces furnace ash