Disclosure of environmental protection information in 2021
Disclosure of environmental protection information in 2021
I. Basic information
Unit name | Sinoway Carbon (Shandong) Co., Ltd. | ||
Legal representative | Han Erdong | Organization code | 913707005845191988 |
Industry type | Calcined petroleum coke | Number of employees | 210 |
Contact | Xu Yushi | Tel.: | 15169641546 |
Fax | 0536-5318266 | Yushi.xu@sinowaycarbon.com | |
Address | No. 06067 Huanghe West Street, Lingang Industrial Park, Binhai Economic and Technological Development Zone, Weifang | ||
Main contents, products and scale of production, operation and management services |
|
II. Project environmental impact assessment and other environmental protection administrative licensing
In 2011, our company entrusted Qingzhou Fangyuan Environmental Impact Assessment Service Co., Ltd. to carry out the EIA work of the Project and prepare the EIA report which passed the approval of Weifang Municipal Ecology and Environment Bureau on December 31, 2011, with the approval number of WEIHUANSHENZI [2011] No. 303. The main work of the Project was completed in October 2013, and was approved by Binhai Economic Development Zone Branch of Weifang Municipal Ecology and Environment Bureau for trial production on May 5, 2014, with the approval number of WEIBINHUANSHIZI [2014] No. 7, and then the project has been in the trial production stage. Our company submitted an acceptance application report to Binhai Economic Development Zone Branch of Weifang Municipal Ecology and Environment Bureau in January 2015 and passed the environmental protection acceptance on June 13, 2015, with the approval number of WEIBINHUANYAN [2015] No. 6, and then the project has been in the normal production stage. On August 15, 2018, the phase II of the Project passed the independent acceptance. During the production period, our company has handled the pollutant discharge permit (913707005845191988001V) to ensure that the company can discharge pollutants with a certificate.
III. Contingency plan for environmental emergencies
According to the Interim measures for the management of contingency plan for environmental emergencies and Administrative measures for the filing of contingency plan for environmental emergencies of enterprises and institutions issued by Ministry of Ecology and Environment of the People's Republic of China, our company has prepared a contingency plan for environmental emergencies and reported it to the Ministry of Ecology and Environment of the People's Republic of China.
IV. Construction and operation of pollution control facilities
(1) Wastewater treatment facilities
The production capacity of wastewater (mainly the domestic wastewater) of the Project is about 4.5 m3/d. The wastewater is used for greening of the factory after being treated by the company's sewage treatment facilities and reaching the standard.
(2) Waste gas treatment facilities
The waste gas produced in the production process of the Project mainly includes organized waste gas and unorganized waste gas. Where, the organized waste gas mainly includes calcination waste gas in petroleum coke calcination section, blanking dust waste gas in calciner, dust waste gas in raw material and dust waste gas in product sub-packaging and storage section and ammonium sulfate drying waste gas. The organized waste gas is subject to SNCR denitration, dust removal by the high-efficiency bag filter, and desulfurization by ammonia desulfurization tower before being discharged up to standard. It is operating normally at present. The unorganized waste gas mainly refers to the unorganized waste gas in calcination workshop, natural volatilization of stored materials, dust generated by vehicle loading and unloading and transportation, slight leakage of workshop equipment and pipelines, etc. The unorganized dust discharged in the calcination workshop is dedusted by bag filter. If dustproof sheds or unpowered fans are installed for treatment, they shall be designed, manufactured, or selected according to national standards in China, and used after passing the inspection. During the use process, they shall be regularly inspected and tested. If severe corrosion and nonconformity are found, they shall be replaced in a timely and correct manner to ensure normal use and avoid pollution.
V. Discharge information
It includes the names of major pollutants and characteristic pollutants, discharge methods, quantity and distribution of discharge ports, discharge concentration and total amount, non-conformance to the standard, as well as the implemented pollutant discharge standards and approved total amount.
List of discharge information for waste gas
S.N. | No. of discharge port | Name of discharge port | Type of pollutants | Permissible concentration limit (mg/Nm3) | Discharge mode | Non-conformance to the standard | Qty. of discharge ports | Discharge destination | |
1 | DA001 | Stack for storage and sub-packaging process of Phase I product | Particulate matter | 10 | Continuous discharge | 无No | 1 | Directly discharge to the external environment | |
2 | DA002 | Discharge port of Phase I calcination blanking process | Particulate matter | 10 | Continuous discharge | No | 1 | Directly discharge to the external environment | |
3 | DA003 | Stack 1 for storage and sub-packaging process of Phase I product | Particulate matter | 10 | Continuous discharge | No | 1 | Directly discharge to the external environment | |
4 | DA004 | Exhaust stack of heat recovery boiler | Ammonia nitrogen oxides | 100 | Continuous discharge | No | 1 | Directly discharge to the external environment | |
Ammonia | 3 | ||||||||
Sulfur dioxide | 50 | ||||||||
Particulate matter | 10 | ||||||||
5 | DA005 | Exhaust stack of raw material system | Particulate matter | 10 | Continuous discharge | No | 1 | Directly discharge to the external environment | |
6 | DA006 | Stack 2 of Phase II calcination blanking process | Particulate matter | 10 | Continuous discharge | No | 1 | Directly discharge to the external environment | |
7 | DA007 | Stack 2 for storage and sub-packaging process of Phase I product | Particulate matter | 10 | Continuous discharge | No | 1 | Directly discharge to the external environment | |
8 | DA008 | Stack 2 for storage and sub-packaging process of Phase II product | Particulate matter | 10 | Continuous discharge | No | 1 | Directly discharge to the external environment | |
9 | DA009 | Stack 2 for storage and sub-packaging process of Phase II product Discharge port 1 of Phase II calcination blanking process | Particulate matter | 10 | Continuous discharge | No | 1 | Directly discharge to the external environment | |
10 | DA010 | Stack of 2 # desulfurization tower | Ammonia nitrogen oxides | 100 | Continuous discharge | No | 1 | Directly discharge to the external environment | |
Ammonia | 3 | ||||||||
Sulfur dioxide | 50 | ||||||||
Particulate matter | 10 | ||||||||
11 | DA011 | Stack for drying exhaust gas of ammonium sulfate | Ammonia (gas) | / | Continuous discharge | No | 1 | Directly discharge to the external environment | |
Particulate matter | 10 |
Total permissible discharge amount to air of enterprises
S.N. | Type of pollutants | First year (t/year) | Second year (t/year) | Third year (t/year) |
1 | Particulate matter | 30.24 | 30.24 | 30.24 |
2 | Sulfur dioxide | 139.6 | 139.6 | 139.6 |
3 | Nitrogen oxides | 302.4 | 302.4 | 302.4 |
4 | VOCS | / | / | / |
Domestic wastewater treatment: our company has newly installed biological integrated treatment equipment to treat all domestic wastewater, which is used as greening water after reaching the standard. The total discharge amount is calculated according to the annual discharge of 1,350m3.
S.N. | Name of solid waste | Category of solid waste | Output of solid waste (t) | Disposal volume (t) | Treatment mode | Remarks |
1 | Collected dust | General solid waste | 3921 | 3500 | Self-utilization | Returned to raw material system for utilization |
2 | Waste activated carbon | General solid waste | 0.5 | 0 | Returned to raw material system for utilization | Not produced |
3 | Sludge | General solid waste | 116.4 | 116.4 | Entrusted for disposal | Temporary storage |
4 | General solid waste | General solid waste | 0.01 | 0 | Entrusted for disposal | Temporary storage |
List of solid waste generation information
VI. Disclosure of hazardous waste information
Enterprise name: Sinoway Carbon (Shandong) Co., Ltd.
Address: No.06067 Huanghe West Street, Lingang Industrial Park, Binhai Economic and Technological Development Zone, Weifang
Legal Representative and Tel: Liu Tao 18364651970
Person in charge of environmental protection and Tel: Xu Yushi 15169641546
Hazardous waste generation scale:
Number of hazardous waste storage facilities: 1 warehouse
Building area of hazardous waste storage facilities: 15 m2
Disclosure of hazardous waste pollution prevention and control information
S.N. | Name of hazardous waste | Hazardous waste code | EIA approval | Source of generation | Pollution control measures | Person in charge |
1 | Waste mineral oil | HW08 | Hazardous waste filing | Daily production | Entrusted handling |
Xu Yushi |
2 | Waste paint drum | HW49 | Hazardous waste filing | Daily production | Entrusted handling | |
3 | Laboratory waste liquid | HW49 | Hazardous waste filing | Daily production | Entrusted handling | |
4 | Waste mineral oil drum | HW08 | Hazardous waste filing | Daily production | Entrusted handling | |
5 | Waste mineral oil | HW08 | Hazardous waste filing | Daily production | Entrusted handling | |
6 | Waste activated carbon | HW49 | Hazardous waste filing | Daily production | Entrusted handling |
List of hazardous waste generation information
S.N. | Name of hazardous waste | Category of hazardous waste | Output of hazardous waste (t) | Storage capacity in the previous period (t) | Disposal volume (t) | Treatment mode | Remarks |
1 | Waste mineral oil | HW08 | 0.58 | 0.45 | 1.03 | Entrusted for disposal | Temporarily stored in hazardous waste warehouse |
2 | Waste paint drum | HW49 | 0.1663 | 0 | 0.1663 | Entrusted for disposal | Temporarily stored in hazardous waste warehouse |
3 | Laboratory waste liquid | HW49 | 0.04 | 0 | 0 | Entrusted for disposal | Temporarily stored in hazardous waste warehouse |
4 | Waste mineral oil drum | HW08 | 0.5 | 1.02 | 1.52 | Entrusted for disposal | Temporarily stored in hazardous waste warehouse |