I. Basic information
Unit name | Sinoway Carbon (Shandong) Co., Ltd. | ||
Legal representative | Liu Tao | Organization code | 913707005845191988 |
Industry type | Calcined petroleum coke | Number of employees | 192 |
Contact | Xu Yushi | Tel. | 15169641546 |
Fax. | 0536-5318266 | E-mail | Yushi.xu@sinowaycarbon.com |
Address | No.06067 Huanghe West Street, Lingang Industrial Park, Binhai Economic and Technological Development Zone, Weifang | ||
Main contents, products and scale of production, operation and management services | Our company mainly deals in calcined petroleum coke with a designed production capacity of 280,000 t/y. |
II. Project environmental impact assessment and other environmental protection administrative licensing
In 2011, our company entrusted Qingzhou Fangyuan Environmental Impact Assessment Service Co., Ltd. to carry out the EIA work of the Project and prepare the EIA report which passed the approval of Weifang Municipal Ecology and Environment Bureau on December 31, 2011, with the approval number of WEIHUANSHENZI [2011] No.303. The main work of the Project was completed in October 2013, and was approved by Binhai Economic Development Zone Branch of Weifang Municipal Ecology and Environment Bureau for trial production on May 5, 2014, with the approval number of WEIBINHUANSHIZI [2014] No.7, and then the project has been in the trial production stage. Our company submitted an acceptance application report to Binhai Economic Development Zone Branch of Weifang Municipal Ecology and Environment Bureau in January 2015 and passed the environmental protection acceptance on June 13, 2015, with the approval number of WEIBINHUANYAN [2015] No.6. The project has been in the normal production stage. During the production period, our company has handled the pollutant discharge permit to ensure that the company can discharge pollutants with a certificate.
III. Contingency plan for environmental emergencies
According to the Interim measures for the management of contingency plan for environmental emergencies and Administrative measures for the filing of contingency plan for environmental emergencies of enterprises and institutions issued by Ministry of Ecology and Environment of the People's Republic of China. In 2014, our company has prepared a contingency plan for environmental emergencies and reported it to the Ministry of Ecology and Environment of the People's Republic of China for filing, with filing number of 3707BH Ⅱ 2014025.
IV. Construction and operation of pollution control facilities
(1) Wastewater treatment facilities
The production capacity of wastewater (mainly the domestic wastewater) of the Project is about 4.5m3/d. After fermentation treatment in a septic tank, the wastewater is transported by wastewater tanker to Weifang Chongjie Sewage Treatment Plant, and discharged into the Weitan River after reaching the treatment standard.
Waste gas treatment facilities
The waste gas produced in the production process of the Project mainly includes organized waste gas and unorganized waste gas. Where, the organized waste gas mainly includes calcination waste gas in petroleum coke calcination section, blanking dust waste gas in calciner, dust waste gas in calcined petroleum coke conveying section, dust waste gas in product storage section, and dust waste gas generated in product packaging. The organized waste gas is subject to filter dust removal, and desulfurization tower for desulfurization before being discharged up to standard. It is operating normally at present. The unorganized waste gas mainly refers to the unorganized waste gas in calcination workshop, natural volatilization of stored materials, dust generated by vehicle loading and unloading and transportation, slight leakage of workshop equipment and pipelines, etc. The unorganized dust discharged in the calcination workshop is treated by the bag filter. If dustproof sheds or unpowered fans are installed for treatment, they shall be designed, manufactured, or selected according to national standards in China, and used after passing the inspection. During the use process, they shall be regularly inspected and tested. If severe corrosion and nonconformity are found, they shall be replaced in a timely and correct manner to ensure normal use and avoid pollution.
V. Discharge information
It includes the names of major pollutants and characteristic pollutants, discharge methods, quantity and distribution of discharge ports, discharge concentration and total amount, non-conformance to the standard, as well as the implemented pollutant discharge standards and approved total amount.
List of discharge information for waste gas
No. | Name of pollution source | Name of pollutant | Discharge concentration (mg/Nm3) | Total discharge (t/a) | Total control amount (t/a) | Implemented standard (mg/Nm3) | Non-conformance to the standard | Discharge mode | Qty. of discharge ports | Discharge direction |
1 | Stack of heat recovery boiler | N2O | No | Continuous | 1 | Directly discharge to the external environment | ||||
SO2 | 75 | 42.34 | 140 | No | Continuous | |||||
Smoke dust | No | Continuous | ||||||||
2 | Stack of calcination blanking process | Particulate matter | 0.47 | 0.85 | No | Continuous | 1 | Directly discharge to the external environment | ||
SO2 | Not detectable | 400 | No | Continuous | ||||||
3 | Stack of petroleum coke conveying process | Particulate matter | 16.8 | 0.85 | No | Continuous | 1 | Directly discharge to the external environment | ||
SO2 | Not detectable | 400 | No | Continuous | ||||||
4 | Stack of product storage process | Particulate matter | 0.23 | 0.85 | No | Continuous | 1 | Directly discharge to the external environment | ||
SO2 | Not detectable | 400 | No | Continuous | ||||||
5 | Stack of product sub-packaging process | Particulate matter | 0.25 | 0.85 | No | Continuous | 1 | Directly discharge to the external environment | ||
SO2 | Not detectable | 400 | No | Continuous | ||||||
4 | Desulfurization tower | SO2 | 300 | No | Continuous | 1 stack | Atmosphere | |||
NOX | 120.33 | 67.9 | 70 | 300 | No | |||||
Smoke dust | 18.17 | 10.3 | 10.3 | 50 | No | |||||
Dust | 9.3-25.3 | 7.56 | 7.56 | 50 | No |
List of discharge information for wastewater
No. | Name of pollution source | Name of pollutant | Discharge concentration (mg/L) | Total discharge (t/a) | Total control amount (t/a) | Implemented standard (mg/L) | Non-conformance to the standard | Discharge mode | Qty. of discharge ports | Destination of pollutant discharge |
1 | Temporary storage of wastewater | COD | 241.5 | 0.326 | 0.16 | 2000 | No | Continuous | 3 | Discharged into Weifang Chongjie Sewage Treatment Co., Ltd |
Ammonia nitrogen | 0.508 | 0.001 | 0.02 | 100 |
Remark: The total discharge amount is calculated according to the annual discharge of 1,350m3.